06-May-2006
Catégorie: Empennage : Hor. stab.
|
After some remaining work on the rear spar, assembly of the front spar. This proved more difficult than anticipated, mainly due to wrong handling of the pneumatic squeezer. I got lot of rivet removal training!!!! The spar is finally complete and the remainder of the day, I worked on the vertical stab. Working time on this subpart Today : 3h (Total : 37h) |
Lectures (3877)
05-May-2006
Catégorie: Empennage : Hor. stab.
|
Today I made big progress, at least visually. The morning was devoted to priming all the parts. This step went quite well considering working with a paint gun was a first for me. Although a professional painter would not be as happy as I am with the result. The paint and the gun are quite easy to use, I chose a HVLP gun which reduces painting mist and runoff risks. Then another big step, the first rivet : it's painted orange just to remember it. Then I assembled the rear spar, Guillaume squeezed a few rivets. And here is the finished spar. Working time on this subpart Today : 5h (Total : 34h) |
Lectures (4542)
05-May-2006
Catégorie: Empennage : Vertical stab.
|
The vertical stab has been primed at the same time as the horizontal stab, for more information see this entry. Working time on this subpart Today : 1h (Total : 12h) |
Lectures (3838)
04-May-2006
03-May-2006
Catégorie: Empennage : Hor. stab.
|
Today I fixed the problem of the oversized hole. Following Van's advice, I cutoff the rib's flange and replaced it with a new fabricated flange that will get riveted to the rib's web (as seen on the picture with four rivets : probaby overkill). Then the whole horizontal stab. got prepared for priming : deburring and dimpling. Sabine came to help with deburring the skins. Working time on this subpart Today : 5h (Total : 26h) |
Lectures (3070)