Building log - Articles les plus récents |
Tout : |
03-Jul-2006
|
Lectures (3733)
30-Jun-2006
|
Three hours to deburr holes and edges. Working time on this subpart Today : 3h (Total : 8h) |
Lectures (3713)
29-Jun-2006
|
The flaps are dissassembled, the spars need now to be countersunk. The spar is 56" long and holds 57 holes. On the picture, the left hole is before countersinking, the center after and in the right one I put a rivet just to check depth. I left the hing in place to guide the pilot of he countersink bit. Working time on this subpart Today : 2h (Total : 5h) |
Lectures (3794)
28-Jun-2006
|
Lectures (3176)
24-Jun-2006
|
Some small parts have to be fabricated for the flaps. On the picture you can see the four shims made from aluminium sheet. The two angles are cut from the stock angle visible in the upper part. Everything then gets sanded to remove the cutting marks. One of the angles is marked for drilling, some more holes will be drilled in assembly. Working time on this subpart Today : 1h (Total : 1h) |
Lectures (3199)