I finished riveting the forward part of the main bulkhead. Here is a picture with the aft part. On the aft part I have four more rivets to install, unfortunately those that are with the kit are too short. I'll have some longer ones delivered shortly. Working time on this subpart Today : 1h (Total : 39h) |
Lectures (2626)
17-Feb-2007
|
Began riveting the forward part of the main bulkhead, there are still some parts to be installed. Working time on this subpart Today : 1h (Total : 38h) |
Lectures (2579)
16-Feb-2007
|
Today, I begun assembling the main bulkhead. I first assemble the control column supports and the control column. I needed too long a time to find out how to arrange the washers to have free play of the controls. Once all was solved, I couldn't resist putting my wooden grips on the sticks. Then I decided to apply the latest Service Bulletin from Vans. The right seat stick has to bolted permanently on rather than being left removable. It's only a hole to drill, a bolt, a washer and nut to install. The I riveted the aft part of the bulkhead, to align everything I use the spar bolts. Working time on this subpart Today : 3h (Total : 37h) |
Lectures (2600)
14-Feb-2007
|
Lectures (2521)
13-Feb-2007
|
Again some work on the main bulkhead. First I primed the countersunk holes, then I riveted the nutplates and installed the bushings. Then, two sapcers have to be fabricated from aluminium tubing. I always cut them a bit long, then get them to the correct length by using the drill press and some abrasive paper. Then I tried to install the control columns. I have some problems figuring out how all will have to work, it looks like the aileron bellcrank, but I think I'll have to adjust the parts to get it work correctly. Working time on this subpart Today : 2h (Total : 33h) |