25-Jun-2009
Catégorie: Finishing : Landing gear

All the parts have been sanded, some small placec needed more filling. The time for the first paint is approaching.

Working time on this subpart
Today :  2h (Total : 57h)

Lectures (2429)
24-Jun-2009
Catégorie: Panel

The panel will incorporate two GRT Sport EFISes from GRT Avionics. After having had a look at all the part I fired the screens up on by bench. The first two pictures are the booting screens, just for software documentation purposes.






And thes are both screens interconnected. The informations are still incomplete as the magnetometers are not connected. The colors are missing too.
The left screen shows attitude, roll, speed, heading.. and engine informations on the lower strip.
The right screen shows the map with airports and airspace.




Working time on this subpart
Today :  1h (Total : 3h)

Lectures (2736)
24-Jun-2009
Catégorie: Engine : Firewall forward

No picture for some small tasks on the engine side of the firewall : length of control cables, electrival wire routings.


Working time on this subpart
Today :  1h (Total : 137h)

Lectures (2570)
24-Jun-2009
Catégorie: Engine : Cowls

Third iteration of the oil filler door. The result looks quite good. Some priming to do before final assembly.




Working time on this subpart
Today :  2h (Total : 118h)

Lectures (2454)
23-Jun-2009
Catégorie: Finishing : Landing gear

I needed three hours to sand and fill all the parts from the different fairings. Even if the look quite good there still remains some works to be done to get a nice finish.




Working time on this subpart
Today :  3h (Total : 55h)

Lectures (2352)