Building log - Articles les plus récents

Tout : 
« 1 ... 166 167 168 (169) 170 171 172 ... 201 »


08-Nov-2006
Catégorie: Wings : Fuel tanks

Today I mainly prosealed the ribs I had already riveted on the right tank. Each rivet receives a glob of proseal and the junction between the rib and the skin gets a fillet of proseal. Visibility is not very good, so it's difficult to make a really nice jb. See the picture for what it looks like.



I also had time to rivet the inboard rib on the left tank. On the picture, when looking through the inspection hole you can the the anti-hangup brackets that prevent the flop tube from getting stuck in a corner.




Working time on this subpart
Today :  3h (Total : 66h)

Lectures (2759)
07-Nov-2006
Catégorie: Wings : Leading edge

Rieveted the second leading edge.
Working time on this subpart
Today :  2h (Total : 22h)

Lectures (2880)
07-Nov-2006
Catégorie: Wings : Fuel tanks

Riveted the two ribs I had prosealed yesterday.
Working time on this subpart
Today :  1h (Total : 63h)

Lectures (2828)
06-Nov-2006
Catégorie: Wings : Fuel tanks

Prosealed two ribs to be riveted tomorrow and riveted the outboard rib with the squeezer.
Working time on this subpart
Today :  2h (Total : 62h)

Lectures (2724)
06-Nov-2006
Catégorie: Wings : Leading edge

Today we finished riveting the right leading edge. I say we, because for the first time Sabine was holding the gun. She did a great job, not one rivet to drill out.
Working time on this subpart
Today :  1h (Total : 20h)

Lectures (2807)

« 1 ... 166 167 168 (169) 170 171 172 ... 201 »