04-May-2010
|
The pitot is installed in the left wing, so I had to route some tubing from the left wing root to the panel. the pictures shows how I opted to to it. First the tubing goes through the main bulkhead towards the left main gear support. Then it goes under the lower left side longeron along the floor. Then it goes uo along the left fuel tank vent tubing, beside the transponder antenna wire. It then comes back to the panel along the upper fuselage longeron. Working time on this subpart Today : 2h (Total : 237h) |
Lectures (2762)
03-May-2010
|
Lectures (2765)
29-Apr-2010
|
Before working on the wiring again, I had to reroute some harnesses as they shoud not be routed together. I had the autopilot harness and the comm antenna sharing the same routing. I then had to decide how I wanted to tie down all the wires along the floor, behind the panel.. The picture shows the tie down pads for the transponder antenna cable in the front left corner of the cabin. Future pictures will show the other tie down methods and places. Working time on this subpart Today : 3h (Total : 90h) |
Lectures (2757)
29-Apr-2010
|
After some sanding, another small filling session, there wer only some minor defects left. I think both wintips are almost ready for paint. Working time on this subpart Today : 1h (Total : 20h) |
Lectures (3264)
28-Apr-2010
|
Lectures (3328)