Building log |
25-May-2009
Fairings
Catégorie: Finishing : Landing gear
|
As the lower cowl is in position, I took the opportunity to install the upper nower gear fairing. There were afew cuts to makes, and some fiberglass work is needed to get a better fit. I also epoxied the lower main gear intersection fairings on the wheel fairings. I the fairing, one of the support brackets is visible as some thickness haas to be built up due to the camber in the fairing where the bracket is supposed to be riveted. The fairing will later be strengthened by a few plies of fiberglass. Working time on this subpart Today : 1h (Total : 47h) |
Lectures (2525)