Building log

12-Apr-2009
Miscellaneous
Catégorie: Engine : Cowls

Onlay small tasks today as I might be called anytime being on standby at home.
First I glue the forward ramp seals to their respective bracket.



I then sand the top cowl around the oil door and do some touch up. I use the remaining epoxy to fill the thousand pinholes. The quality of the finish leaves to be desired.



I then do some tweaking on exhaust hangers. And finish today's session by cutting the nos gear leg fairing as it was too long and interfering with the lower cowl support bracket.




Working time on this subpart
Today :  3h (Total : 92h)

Lectures (2213)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami