Building log

26-May-2008
Relays
Catégorie: Engine : Firewall forward

I installed the battery and starter relays. A copper bar is installed between the two relays. Drilling copper is less than easy.



Here all is finished and the diodes installed.




Working time on this subpart
Today :  1h (Total : 12h)

Lectures (2385)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami