Building log

22-Jan-2008
Plumbing.. next
Catégorie: Fuselage : Cabin

Still fiddling with the brake lines, I try to adjust the lines going from the parking brake valve to the fitting exiting the fuselage near the main gear weldment. Here the brake valve view.



Here a view towards the back. The gear weldment on the right and the blue fitting further right. On the floor, one of the rib support cover I had to remove, the line is going through the support and this will give some trouble.



Here is the fitting that will exit the floor. the line end has still to be flared, but before there is a sleeve and a nut to slip on it. This will prevent the line to be pulled through the rib cover support bushings, so I think it has to be done once everything is installed for good. I don't have to do it now, so I'll wait a bit.




Working time on this subpart
Today :  2h (Total : 123h)

Lectures (2617)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami