Building log - Articles les plus récents |
Tout : Finishing : Canopy |
24-Mar-2008
|
Work on the canopy will be next, some fuselage parts have to be reinstalled. First the rollbar, the access to the bolts is not that great so it takes some time. Then all the panel support rib and brackets have to be installed. I could not resist checking with the forward part of the canopy frame. I seems to look good, but I know there will be a lot of work to have everything in place. Here, a shot with the frame partly open, to show how it will operate. Working time on this subpart Today : 2h (Total : 2h) |
Lectures (2493)