After some cleaning and rearranging of the workshop, I tackked the brake assembly. They just came back from being anodized (thanks Antoine). The riveting is not a big deal. Then I begun intsalling the brake cylinders, but the plans are not very clear so I just installed the springs that will help the brakes return to the neutral position as it seems the internal spring is sometimes a bit too weak. The workshop is closed during Chistmas time. Merry Christmas Working time on this subpart Today : 1h (Total : 104h) |
Lectures (2243)
17-Dec-2007
|
Lectures (2321)
13-Dec-2007
|
I had to work on the parts that got primed yesterday. First I riveted all the nutplates and then riveted the parts together where it was possible. Then I reassembled the aileron trim, I'll install it in the fuselage later. And I finished by priming the interior of the elevator control rods. I used Van's method, capping one end, pouring some primer, capping the second end and shaking the rod. To have the primer dry I took the rods into the house. Working time on this subpart Today : 2h (Total : 102h) |
Lectures (2344)
12-Dec-2007
|
Lectures (2602)
11-Dec-2007
|
Lectures (2629)