26-Aug-2008
|
As I'm preparing the next finish paint session I assemble the subpanel. The left side is assembled on the workbench. On the right side, I will install a glovebox. A rectangular hole is cut in the subpanel and then the forward deck will also have to be cut along the blue line on the picture. Working time on this subpart Today : 2h (Total : 176h) |
Lectures (2179)
22-Aug-2008
|
The reassembly of the cabin parts goes on. I first verified the torque of all the nuts, mainly tise of the main gear supports. Then I riveted both fresh air sccops. Next parts to be reinstalled were the fuel vent lines. A third hand could be used for some of the clamps Then I riveted the top of the bagage bulkhead wondering why I didn't do it earlier. I also riveted the upper rib to the next bulkhead,which didn't go as planned, I'll have to drill out the rivets and redo them after the upper skin is installed. Working time on this subpart Today : 4h (Total : 174h) |
Lectures (2144)
15-Aug-2008
|
Lectures (2335)
11-Aug-2008
|
Today was painting day. Despite access being somewhat ackward everything went about fine. Only one big run on the bagage bulkhead? I'll try to remove it later. I also painted all the non installed parts. And I also painted the canopy deck in black. Working time on this subpart Today : 5h (Total : 168h) |
Lectures (2195)
09-Aug-2008
|
Lectures (2113)