Building log - Articles les plus récents |
![]() |
Tout : Empennage : Tip |
04-Sep-2008
|
Filler applying goes on slowly, the parts I did yesterday cannot be sanded as the are not cured enough. After hanging the rudder, I decide to tackle the gap between the rudder and the vertical stabilizer. For this I fabricate a shim as thick as required and fill the gaps with the shim in place. The snading and finishing will be done with the parts of the fuselage. Working time on this subpart Today : 1h (Total : 24h) |
Lectures (2307)
03-Sep-2008
|
First task is to finish the bonding of the remaining fiberglass strips. Then I mx up some epoxy and microballoons to begin filling all the gaps. The slurry is a bit to dry to be applied perfectly. I'll wait for it to dry, then do some sanding tests and then try to perfect my work. Working time on this subpart Today : 2h (Total : 23h) |
Lectures (2288)
02-Sep-2008
|
I first rivet the elevator tips and begin to mold the front part around the counterweight. Then I install a strip of fiberglass to cover the gap between the tips and the structure. The picture shows the vertical stabilizer. I use the method described HERE. It works very well, the working environment stays clean and its possible to take the strips to another part of the workshop without to much mess. Working time on this subpart Today : 3h (Total : 21h) |
Lectures (2444)
01-Sep-2008
|
Before riveting the tips, I prime approx. 4" of the skins it will protect the skins while making a smooth transition from the tip. Then the tips are riveted to the stabilizer. I will rivet the elevator tips later as I want to bond them to the counterweights. Working time on this subpart Today : 2h (Total : 18h) |
Lectures (2239)
30-Aug-2008
|
This morning I adjusted and drilled the tips of the horizontal parts of the empennage. It may look like nothing but there was some work to be done: drilling, countersinking the fiberglass parts and dimpling the aluminium. Then I cutout some small ribs in lght foam. During the drilling, the aluminium strips bonded yesterday came of. So I had to glue them again (I think the better sequence is : drill the tips first, then drill the aluminium strips, then glue the strips). I also glued the foam ribs and made a small repair on the empennage fairing (see the white peel ply strips). Working time on this subpart Today : 4h (Total : 16h) |
Lectures (2237)