Building log |
![]() |
15-Sep-2011
Cleaning
Catégorie: Assembly
|
I first tried to install the wing root fairing and succeeded, but the seal does not look that good, I think the gap with the fuselage is too wide. I will install new fairings later. I then installed the fuel lines in the cabin for good. I also cleaned the floors and installed the noise reduction mats. I still have some small items to finish before installing the underseat floors. Working time on this subpart Today : 4h (Total : 74h) |
Lectures (2897)