Building log

25-Nov-2010
Engine controls..bis
Catégorie: Panel

I finished the engine controls installation. First I screwed on the firewall passthroughs. Not very difficult but one needs to crawl under the panel.



I then finished the engine side of the alternate air control cable. The clamp on the right side of the picture was quite difficult to bolt down properly.




Working time on this subpart
Today :  2h (Total : 117h)

Lectures (2628)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami