Building log |
13-Sep-2010
Harnesses
Catégorie: Empennage
|
I go on trying to tidy up the wire harnesses. I have to install platenuts (hence drilling, dimpling....), make some small brackets a lot of small time consuming tasks. This show the left side between the firewall and the subpanel. This is behind the subpanel, not finished yet. Working time on this subpart Today : 3h (Total : 199h) |
Lectures (3286)