Building log |
08-Sep-2010
Lacing
|
As it's pouring down today I postpone working on the wing. So I go on with lacing the wiring. After having done the right stick, I can cleco the floors. I then do some small works including the service bulletin on the autopilot pitch servo. To finish the afternoon I begin lacing the harnesses running along the floor. This is the left side. Working time on this subpart Today : 4h (Total : 192h) |
Lectures (2357)