Building log |
![]() |
07-Aug-2010
First amps
|
I first rearrange the wirings runs along the floor and crimp some missing terminals. The intercom will be done later so I now have to wire the fuse blocks And after having installed the EFIS and flipped the corresponding switch, here is the result. Working time on this subpart Today : 3h (Total : 159h) |
Lectures (2476)