Building log

04-May-2010
Pitot tubing
Catégorie: Fuselage : Cabin

The pitot is installed in the left wing, so I had to route some tubing from the left wing root to the panel. the pictures shows how I opted to to it. First the tubing goes through the main bulkhead towards the left main gear support.



Then it goes under the lower left side longeron along the floor.



Then it goes uo along the left fuel tank vent tubing, beside the transponder antenna wire.







It then comes back to the panel along the upper fuselage longeron.




Working time on this subpart
Today :  2h (Total : 237h)

Lectures (2691)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami