Building log |
28-Jan-2010
Prep work
Catégorie: Panel
|
Before beginning the real wiring, I first have to install all that goes behind the panel. So I first gathered all that is needed. On the bottom row, the four fuses blocks. On the top row, the angle of attack CPU, the safety trim CPU, the flaps positionning CPU, the alticoder, the pressure switch for the trim CPU and a diode. To make sure I had forgottent nothing, I decided to mark all the items included in the wiring (some 130 parts). I then installed the static and pitot fittings to the EFISes and autopilot. I also fitted the connectors to visualise the space left to install all the stuff. That is the next task. Working time on this subpart Today : 3h (Total : 68h) |
Lectures (2569)