Building log |
25-Jan-2010
New rib
Catégorie: Panel
|
I have received the panel support rib and did all the work to install it: drilling, deburring, dimpling. I still have to prime and to paint it. I then put some finishing touches on the panel: riveted one missing nutplate and drilled the holes for the tab washer of the switches. I also riveted the nutplates on the mapbox. I installed the panel and subpanel into the fuselage as I have to fabricate the rear support bracket for the radio trays. I have not decided how this will be done and first will have to adjust the trays to the subpanel. Working time on this subpart Today : 3h (Total : 60h) |
Lectures (2553)