Building log |
![]() |
18-Jan-2010
Rivets and switches
Catégorie: Panel
|
Before riveting all the aluminium angles to the back of the panel, I spray a light coat of primer where the parts will mate. I then rivet all the angles and the nutplates. I then make a trial installation of the switches. I will have to buy a feaw more as they are not all the same. The switches get installed with some wahers. One of the washer has a little tab. So I drill the back of the panel being careful not to drilled through to avoid having a hole below the switch. The (bad) picture shows the result. Working time on this subpart Today : 4h (Total : 57h) |
Lectures (2523)