Building log |
![]() |
29-Dec-2009
Mapbox
Catégorie: Panel
|
It's high time I begun drilling the panel. I decide to begin with the mapbox. I used a method described in the 5th 2008 Rvator, Vans's news letter that can be downloaded here. The first cut is done using a jigsaw. I needed almost two hours to file the opening to the correct size. After the hinges are riveted I make some small adjustments. This is the door in the open position, I still have to install some kind of lock. Working time on this subpart Today : 4h (Total : 30h) |
Lectures (2568)