Building log |
![]() |
14-Oct-2009
Magnetometers..bis
Catégorie: Panel
|
The angle having been primed, I had to reinstall the magnetometers. The final tweaking will be done later. I also fabricated the harness. In fact I had to disassemble the GRT harness, install wires into the D-SUB, put some heatshrink and assemble the shell. I still have to mark the wires and route them to the fuselage and the panel. Working time on this subpart Today : 2h (Total : 6h) |
Lectures (2702)