Building log

04-Oct-2009
Spinner
Catégorie: Propeller

Still working on the spinner installation. After having sprayed a coat of primer on the gap fillers, they were assembled and riveted to the rear plate. One rivet is missing as it was impossible to squeeze without removing the propeller, I will do it later.



I then countersunk the holes on the spinner and tweaked the blades' openings. There are a few small gaps between the forward plate and the spinner, I use some proseal to fill them and have the spinner tight on the plate. To avoid having the proseal stick to the plate it is wrapped in cellophane.



This shows the screw holding the spinner to the filler gap.



This is a global view, I'm now waiting for the proseal to cure.




Working time on this subpart
Today :  2h (Total : 11h)

Lectures (2847)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami