Building log

09-Jun-2006
Deburring, dimpling, sanding
Catégorie: Empennage : Elevator

A whole day preparing all the elevator's parts (at least those that are usable), before priming. I run into small problems dimpling one of the holes on the trim tab as it is very close to the bend. We'll see how it goes for the riveting part.
Working time on this subpart
Today :  5h (Total : 31h)

Lectures (2850)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami