Building log

26-May-2009
Filling..2
Catégorie: Engine : Cowls

I begin by filling the voids between the upper inlet ramps and the cowl. Once cured, I will be able to lay some fiberglass.



Surface finishing is then on the agenda. First some sanding then painting with amix of epoxy and acetone.
The picture show how the cowls are glossy after the mixture has been applied.




Working time on this subpart
Today :  2h (Total : 105h)

Lectures (2430)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami