Building log

25-May-2009
Filling
Catégorie: Engine : Cowls

The long task of filling the cowl goes on. After a thorough sanding, I applied some epoxy putty to all the big holes that have to be filled. Netx operation will be to use the Van's method for all the pin holes.


Working time on this subpart
Today :  2h (Total : 103h)

Lectures (2386)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami