Building log

18-May-2009
Scoop..3
Catégorie: Engine : Cowls

Before building up the fiberglass on the scoop, I test fitted the lower cowl to check if everything looked good.
This is the repair I had to do on the misdrilled holes for the camlocks.



This is the scoop.
I added two layers of heavy weight cloth and one layer of light weight for the last layer.
After its cured, the cowls will be ready for finishing.




Working time on this subpart
Today :  2h (Total : 98h)

Lectures (2445)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami