14-May-2009
Some small tasks
Catégorie: Engine : Firewall forward

I begin by installing the rear baffle that has to be drilled for the fuel hose going from the injection block to the injection spider.
The picture shows the result.



Then I installed some clamps to hold the ignition cables for the lower plugs.



I then wanted to fabricate the harness for the electronic ignition, but the parts I had did not match those in the installation manual. I took this picture to sort this out with Mattituck or Emagair.
Even if the parts are correct I'm missing one of the silicon glands.



A visit to the EMagair website showed that the installation manual has been updated and that my parts are correct. I now have to find one of those silicone glands.
Working time on this subpart
Today :  2h (Total : 112h)