Building log

29-Apr-2009
Switch strip
Catégorie: Panel

The panel's final configuration is nearing, and I need some more space soI added a subpanel that will hold the switches, the engine controls and some small items.
Here the U channel has been cut for the vents.




Working time on this subpart
Today :  2h (Total : 2h)

Lectures (2413)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami