Building log

27-Apr-2009
Canopy jettison
Catégorie: Finishing : Canopy

At the end of last visit I discovered that if I wanted the aircraft to be classified as aerobatic, I would have to install the original jettison mechanism. So I modified my modification to built as per plans.
To do this I had to uninstall the vertical handle, install the lever and the handle.
This is the lever.



The handle and the return spring.



And the handle seen from the cabin side.



I then installed a paper copy of the panel. Some more little tweaking to be done.




Working time on this subpart
Today :  2h (Total : 116h)

Lectures (2431)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami