Building log

27-Apr-2009
Small tasks
Catégorie: Engine : Cowls

Today, I begun by some small tasks on the cowls. The scoop has to be connected to the airbox. This is done by building a small fiberglass tunnel. And the mold for the tunnel is done by glueing some fome to the cowl. As soon as the glue has set, I'll open up the foam.




I also modified the oil filler door by adding small shims under the latches, as the gap was a bit too small.




Working time on this subpart
Today :  1h (Total : 93h)

Lectures (2226)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami