Building log

10-Apr-2009
Oil cap..again
Catégorie: Engine : Cowls

I think that from now on, a part of the workshop will always have some parts where there is fiberglass work to be done.
I begin by working again on the oil door. First a rough sanding of the work done last time.



Then the edges where the door lies when closed have to thickened by some filler.




Working time on this subpart
Today :  1h (Total : 50h)

Lectures (2320)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami