| Building log |   | 
03-Apr-2009
| Oil filler cap | 
| The oil filler door installation took some time as there is quite a lot of tweaking to be done. First I made the cuts on the door and on the cowl. Next I installed the hinge (it's not the standard Vans hinge). I had some problems with that, and it may need a bit more tweaking. The cutouts for the locks proved also to be less than easy. I'm statidied with the result, but it's not perfect. This is a view with the door open. I still have the rivets to install and the cowl to fill around the door. Working time on this subpart  Today : 3h (Total : 44h) | 
Lectures (2418)
 
 
    

 
       
       
       
       
      
    


 
      
      
      Miscellaneous
Miscellaneous Tools
Tools