Building log |
24-Mar-2009
Lower cowl inlets
|
Some small tasks around the inlet on the lower cowl. There will be a seal between the lower lip of the inlet and the ramp. The seal will be glued to a small aluminium strip that will be screwed to the cowl. The shape is not that easy to get, this is one of the sides drilled to the cowl. I then drilled the holes for the nuplates on the inner side. I had to move some holes I had drilled as there was some interference with the strip fabricated earlier or the nuplates could not be correctly installed (it's easy to move holes in fiberglass, as you only have to fill the wrong ones). Working time on this subpart Today : 1h (Total : 41h) |
Lectures (2123)