Building log

02-Mar-2009
More rivets
Catégorie: Engine : Cowls

The lateral hinges will get riveted today, as I stillhave some proseal left over I'll use it as it's a very good adhesive. So the dreaded black stuff is back.
It takes quite some time as all the extra holes have to be filled.
A view from inside.



And a more pleasing view from outside.




Working time on this subpart
Today :  3h (Total : 37h)

Lectures (2253)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami