Building log |
02-Mar-2009
More rivets
|
The lateral hinges will get riveted today, as I stillhave some proseal left over I'll use it as it's a very good adhesive. So the dreaded black stuff is back. It takes quite some time as all the extra holes have to be filled. A view from inside. And a more pleasing view from outside. Working time on this subpart Today : 3h (Total : 37h) |
Lectures (2253)