Building log |
07-Feb-2009
Baffles..2
Catégorie: Engine : Firewall forward
|
Another work session on the baffles. I first rivet the parts I worked on yesterday. Here is one of the parts with the doublers riveted after deburring, dimpling and some priming I then deburr all the small parts as the production process leaves them quite rough Then I begin working on the forward parts, with the right side. There are five parts to assemble. On this part I have to install a grommet for the propeller regulation oil line. The engine is equipped for constant speed, but I will install a fixed pitch propeller. Working time on this subpart Today : 3h (Total : 25h) |
Lectures (2117)