Building log |
![]() |
25-Oct-2008
Plumbing..againt
|
The afternoon was spent finishing the plumbimg, or rather tidying all around the brake and fuel line. First I had to bend the ears of the forward cover before checking there was no interference with all the lines. Due to the floor vibrations, the lines have to be supported. I cut some heavy foam, but as I will also install some noise attenuation foam it comes out too thick. I will have to find some thinner foam, or come up with another idea. Then I bolted the fuel valve to its bracket, reinstalled the fuel pimp, tweaked a bit the line to the left fuel tank. I only have to check there is no serious interference between all this lines and may be protect some with plastic tubing. Working time on this subpart Today : 2h (Total : 190h) |
Lectures (2636)