Building log

06-Oct-2008
Sanding still
Catégorie: Empennage : Tip

I begin by sanding the vertical stabilizer tip. I have some low spots that I filled, next sanding should not be very long and be the final sanding on this part.



Then I sand the left elevator and apply a layer of pure epoxy. One final sanding and the part should be finished.

Then I sand the upper tip of the rudder, some filling had to be done, so still some work ahedad on this part. On the lower tip I fond a problem with the last epoxy layer that does flakes off. So I sand it off, more work on this part next time.




Working time on this subpart
Today :  2h (Total : 52h)

Lectures (2447)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami