Building log

04-Oct-2008
Back to the future
Catégorie: Empennage : Tip

Today I wanted to final sand the two tips I had already primed. But this proved more difficult than expected as the primer came off after sanding and cleaning. So I decided to sand the whole primer and to fill again the parts that needed it. The left elevator was quite a lot of work, but the vertical stabilizer having a better finish was easir to do.


Before



After



Working time on this subpart
Today :  2h (Total : 50h)