Building log

16-Sep-2008
Vertical parts
Catégorie: Empennage : Tip

I reassembled the rudder and the vertical stabilizer to see how the tips fit now that I have extended the one on the stab. It looks quite good just some sanding to do. The gap seems also to be correct.
I then begin putting on the finishing putty, the brown color is due to the phenolic microballoons which are supposed to be easy to sand. We'll see tomorrow after the epoxy has cured.




Working time on this subpart
Today :  1h (Total : 33h)

Lectures (2526)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami