Building log

01-Sep-2008
Prime
Catégorie: Empennage : Tip

Before riveting the tips, I prime approx. 4" of the skins it will protect the skins while making a smooth transition from the tip.




Then the tips are riveted to the stabilizer. I will rivet the elevator tips later as I want to bond them to the counterweights.




Working time on this subpart
Today :  2h (Total : 18h)

Lectures (2134)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami