Building log

30-Aug-2008
Drilling....
Catégorie: Empennage : Tip

This morning I adjusted and drilled the tips of the horizontal parts of the empennage. It may look like nothing but there was some work to be done: drilling, countersinking the fiberglass parts and dimpling the aluminium.




Then I cutout some small ribs in lght foam.




During the drilling, the aluminium strips bonded yesterday came of. So I had to glue them again (I think the better sequence is : drill the tips first, then drill the aluminium strips, then glue the strips).
I also glued the foam ribs and made a small repair on the empennage fairing (see the white peel ply strips).




Working time on this subpart
Today :  4h (Total : 16h)

Lectures (2239)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami