Building log

28-Aug-2008
Map box, again
Catégorie: Fuselage : Cabin

The mapbox is riveted and then installed in the fuselage. This does not go without some problems as I have some problems reinstalling the subpanel. Using another sequence it goes better, but the fact that the left side is already riveted does not help.
I will also have to file a bit the opening in the subpanel. I also make two pilot holes in the panel, the other holes will be drilled later.




Working time on this subpart
Today :  2h (Total : 181h)

Lectures (2184)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami