Building log |
![]() |
28-Aug-2008
Map box, again
|
The mapbox is riveted and then installed in the fuselage. This does not go without some problems as I have some problems reinstalling the subpanel. Using another sequence it goes better, but the fact that the left side is already riveted does not help. I will also have to file a bit the opening in the subpanel. I also make two pilot holes in the panel, the other holes will be drilled later. Working time on this subpart Today : 2h (Total : 181h) |
Lectures (2184)