Building log |
28-Aug-2008
Screwed
|
The day begins with the installtion of the canopy on the frame. The screws are tightened just enough to avoid cracking the plexiglas. At the end of the day, I reinstall the canopy on the fuselage. The next operation will be to fabricate the seal and the fillet at the front. Working time on this subpart Today : 2h (Total : 123h) |
Lectures (2209)