Building log

28-Aug-2008
Screwed
Catégorie: Finishing : Canopy

The day begins with the installtion of the canopy on the frame. The screws are tightened just enough to avoid cracking the plexiglas.
At the end of the day, I reinstall the canopy on the fuselage. The next operation will be to fabricate the seal and the fillet at the front.




Working time on this subpart
Today :  2h (Total : 123h)

Lectures (2209)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami