Building log

26-Aug-2008
Sub-panel
Catégorie: Fuselage : Cabin

As I'm preparing the next finish paint session I assemble the subpanel. The left side is assembled on the workbench.




On the right side, I will install a glovebox. A rectangular hole is cut in the subpanel and then the forward deck will also have to be cut along the blue line on the picture.




Working time on this subpart
Today :  2h (Total : 176h)

Lectures (2181)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami