Building log |
25-Jul-2008
Drilling and sanding
|
Work on the canopy goes on. First all the elements get disassembled to allow for the cleaning of the frame. Some sanding is also needed, some places have been roughed up during the building process. The frame now needs to be primed again before the skin and skirts can be riveted. Then I work on the rear window. I did all the countersink and enlarged all the holes. The holes are drilled larger than the screws to allow for plexiglas expansion under the summer heat. I also did a small cut on the rear. The only work left on the window is the adjustment of the forward gap with the canopy. I the prepared all the parts that have to be primed. Working time on this subpart Today : 4h (Total : 104h) |
Lectures (2133)