Building log |
10-Jun-2008
First cuts
|
The sunny weather allowed work to begin on the canopy. Before cutting anything the lines had to be redone as the tape didn't adhere anymore. The cut is done with an angle pneumatic grinder. It takes some time as the grinder uses lots of air and the plaxiglas is quite thick. After some length is cut, some tape is used to hold the cut off part to avoid any cracks. To do the cut, complete attire is mandatory : mask, goggles and cap because there is a lot of very small dust particles. Here, the four parts are cut off, next step will be to adjust the canopy to the fuselage. Working time on this subpart Today : 2h (Total : 69h) |
Lectures (2076)